menu_icon
menu_icon
logo
logo
Working with UHSM

Property Tectonics have worked with UHSM for over 10 years and have undertaken a vast number of wide ranging projects.

  • USHM

    Working with UHSM

    Property Tectonics have worked with UHSM for over 10 years and have undertaken a vast number of wide ranging projects.

    View our timeline below for an overview of some of the projects we have worked on.

  • 2003 – Ongoing

    Included on a Building Surveying Framework Agreement covering the full range of Building Surveying Services. Renewed every 3 years.

  • 2003 – 2009

    Condition Surveys and various CDM-C services provided to the hospital.

  • Tower Block

    Tower Block July 2009 – March 2010

    Lead Consultant & CDM-C for a major refurbishment and upgrade of the external building envelope including concrete repairs, window replacements, external cladding, balcony repairs and roof renewal. The Tower Block is central to the hospital site and houses the executive team.

  • Decontamination Unit

    Decontamination Unit September 2010 – January 2011

    Lead Consultant & CDM-C for the creation of a new centralised ‘decontamination unit’ housing the Trusts new Automated Endoscope Reprocessors.

  • Link Corridor

    Link Corridor Re-Roofing Project May 2011 – July 2011

    Designer and CDM-C for the removal of an existing defective asphalt roof and replacement with a new insulated felt roof.

  • Concrete Repair

    Concrete Repair Scheme January 2009 – Ongoing

    Designer and CDM-C for the ongoing phased concrete repair scheme for the entire hospital site due for completion in 2015/16.

  • Childrens Ward

    Children’s Ward Corridor Refurbishment November 2013 – December 2013

    Designer and CDM-C for the renewal of floor, wall and ceiling finishes to the children’s ward main link corridor including phased completion and out of hours working.

  • Window Replacement Scheme February 2010 – Ongoing

    Designer and CDM-C for the ongoing phased window renewal scheme; replacing timber framed single glazed units with double glazed uPVC frames and associated works.

  • Simulation Suite

    Simulation Suite January 2013 – March 2013

    Lead Designer and CDM-C for the creation of a new simulation training suite enabling the Trust to provide training to both students and practicing medical professionals.

Back to Case Studies